In Omsk, Budarin’s fare is being repaired. It is planned to finish all work until October 20. This day is a festive for road builders of the country.
In Omsk, work is carried out to increase the throughput of roads and eliminate obstacles to vehicles. For this, an analysis of the city’s road network was carried out and areas that need to be modernized. It was decided to organize through passage of vehicles on Budarin Street behind the LimTur-Center shopping center.The work on this site has already begun, the first stages have been completed: the construction garbage was removed and the construction was removed, the issue of the need to buy crushed stone is discussed, the price should be acceptable, but the fast delivery of building material is required to continue road work. After strengthening the road with bulk gravel, it is planned to move on to asphalting of the passage on Budarina Street. The length of the fare will be 100 meters with a width of 6 meters. Sidewalks for pedestrians are planned to be made up to one and a half meters wide so that the townspeople can safely walk along them. Representatives of the city administration monitor the progress of construction work. Before the completion of the reorganization of the passage of Budarin, there was very little time left. Work should be completed on October 20. Local residents expect the completion of work on the improvement of the road, which will enable motorists to freely travel to neighboring streets. Today in Omsk they begin to celebrate the day of the road economy. At 12 o’clock a meeting will be held on the award of the best workers. During the year, the road to Amurskaya was reconstructed, the bridges of Leningrad, Oktyabrsky, Yubileiny were repaired.
Оставить коммент.